This article deals with the numerical reliability analysis of nuclear power plants auxiliary power distribution systems, specialliy for presurised water reactor (PWR) with four parallel operated divisions (300% active redundancyof main electrical systems. Contrary to the most of similar studies this one is performed with respect to the dynamic aspects of system operation instead of []